top of page

SW 18th Ave Is Getting a Facelift!


SW 18th Ave between Salmon St and Yamhill St is getting a facelift so to speak. The NEW Lincoln High School will be going in on the Southeast corner of 18th and Salmon noted by the first arrow on the left (completion scheduled for Fall 2022). The middle arrow indicates the Butler Block construction site (Northeast corner of 18th and Salmon) and the right arrow indicates the Press Block building site (Southeast corner of 18th and Yamhill). All 3 projects are underway and will bring 4 construction cranes to the landscape.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page